CSBC Kaohsiung Shipyard

Shipyard Information

This shipyard, with its construction completed in June, 1976, was one of The Ten Major Economic Construction Projects of The Republic of China in the seventies.

  1. One 1.000.000 dry-dock measures 950m long, 92m wide and 14m deep. With the intermediate gate, it can be sectioned into 3 stages of 180, 390 and 380m. Two goliath cranes, 350 tons each, astride over the dry-dock and the grand assembly area.
  2. An 100.000 tons repair dry-dock measures 275m long, 45m wide and 12m depth equipped with most advanced running utility system specially for ship repair.
  3. 1,800m long quay walls with depth of 10m are well covered by a number of railed LL-cranes and utility system.
  4. There are 5 production works namely, Hull Works, Out fitting Works, Special Project Works. Ship Repair and Machinery Manufacturing Works. All equipped with skilled workers and modern facilities.

Docks

Type Length (m) Breadth (m) DWT Capacity (Tons) Lifting Capacity (Tons) Crane (Tons)
D/D 950,00 92,00 1.000.000 - -
D/D 275,00 45,00 100.000 - -

Shipyard Location

Google Map